For this assignment you are required to create a Strategic Plan for a mutually agreed-upon, proposed business venture.

Bellissimo Consulting and Contracting
Strategic Management

Strategic Plan Project – Event Planning

Directions:

For this assignment you are required to create a Strategic Plan for a mutually agreed-upon, proposed business venture. The team that I was assigned to has agreed on Event Planning.

This exercise will require you to demonstrate your understanding of strategic management concepts and theories by articulating thorough and well-thought-out responses to 13 specific questions provided. (I WILL ONLY NEED 4 OF THESE QUESTIONS ANSWERED and my teammates will do the rest)

This will be graded based on analytical and critical thinking skills, completeness, correct spelling, correct formatting and neatness. It should be double-spaced, 12-point font, and not exceed 6 pages.

The specific questions that need to be answered are as follows:

1. Write a vision statement. A vision captures an organization’s aspiration and spells out what it ultimately wants to accomplish.

2. Perform a SWOT analysis. This addresses the company’s strengths, weaknesses, opportunities and threats.

3. Establish approaches to reaching strategic goals. For example, if a goal is to double sales in the next year, indicate that the sales force will be increased by _____% by the end of the next year.

4. Develop an operating budget to fund the strategic plan. Indicate the resources required and their cost.
You are a joint partner in Bellissimo Consulting and Contracting LLC. You have prepared the following project network to support a large commercial landscaping project for which your firm has been contracted to complete. The duration of each activity is stated in weeks. As noted in the network, you expect to complete the project in nine (9) weeks based on the availability of three tractors already parked at your project site. Each of the tractors is outfitted with a piece of specialty equipment that cannot be procured or rented within any reasonable time frame. In other words, assume the following:

 You cannot complete the project activities without use of the tractors.
 You cannot get more tractors for your project.
 You cannot substitute any other equipment for the tractors.
The number of tractors required for each activity is defined in the center cell of each activity node (note the RES cell in the Legend diagram).
The contract with your customer includes a significant penalty clause for failure to complete the project within 11 weeks. Beginning in the twelfth week, you will be penalized $1000 per week for each week of schedule overrun.
MGMT 450 Project Management

Your business partner has just called you and informed you that one of her tractors with the exact same specialty equipment has just been involved in a serious accident and is permanently out of commission. She is facing a similar penalty clause for late delivery of her project and wants to use one of your tractors for the next three to four months. As noted above, there is no other place these tractors can be obtained.

Using the parallel method and the following loading chart templates, develop a resource schedule that will identify whether you can release one of your tractors to your partner’s project and still successfully complete your project without triggering its penalty clause.

Ensure you adhere to the following guidelines:

 Use the parallel method and heuristics outlined in your lecture slides to schedule the activities.
 Assume that the Limiting Assumptions and Risk Assumptions outlined in your lecture slides apply.
 Assume the project network is constructed in a manner that represents the technical constraints of the project.
Constrained Resource Schedule

Using the parallel method and guidelines from the instructions above, work through the constrained resource scheduling to determine if you can successfully release one specialty tractor to your business partner without jeopardizing your own penalty clause?

Attachment 1
Attachment 2
ID 11444152ID 443135270ID 227ID 69110201237293ID 57020LEGEND347ESIDEF0ID 33SLRESSL01LSDURLF033TSFS

 

"Get yourself this Paper or a similar one at an unbeatable discount!"

"Order a similar paper and get 15% discount on your first order with us
Use the following coupon
"FIRST15"

Order Now